INdustrial projects

Artis Park Winsford

Contract for the construction of the Artis Park development at Road One Winsford. The project comprises of 13 no units and associated external works.

X-Cel Superturn AMP Rotherham

Project to construct a new standalone production facility on the adjacent plot. X-Cel Superturn (GB) Ltd specialise in producing precision machined components.

Hydra Kids Sheffield

Childrens Play Unit for RW Simpson Transport Sheffield – duration: 16 weeks.

MKM Builders Merchants Haverhill

HP have recently completed on site at Haverhill to build a storage and retail unit which has been taken by MKM Building Supplies.

Verder UK Castleford

Conversion of single storey 33,000 ft2 unit into an office and production facility – including 15,000 ft2 office on two floors with first floor mezzanine – duration: 16 weeks

Thurmaston Industrial Estate Leicester

Contract for construction of four units totalling 155,000 sq ft with tenants to include Wickes, Travis Perkins, Benchmarx, BSS and Leicester Tissue Company.

Joint Replacement Instrumentation Limited

28,000 ft2 fit out contact – sum approx £800k – duration 13 weeks. Joint Replacement Instrumentation is a British manufacturer of orthopaedic implants and instrumentation.

Wickes Store Watford

Works have recently completed on the new Wickes home improvement centre and employment unit at Otterspool Way Watford.

Rutland Plastics

Contract was to build a single storey warehouse with integral office totalling 30,000 ft2.

Travis Perkins Ruislip

HP Construction have now completed the 15,000 ft2 trade unit at Stonefield Way Ruislip which includes 3,900 ft2 shop fit out package, 3,900ft2 mezzanine and 7,200ft2 warehouse area.

Warehouse and Office Tri Link Park Normanton

Warehouse and office scheme totalling 142,000ft2 at Normanton, Castleford.

Wickes Sutton

Wickes Trade unit and three further trade units totalling 33,000ft2.

CMS Cepcor

HP have now completed the head office and industrial warehouse unit for CMS Cepcor at Coalville Leicestershire. The scheme totalled 27,000ft2 unit comprising of 11,000ft2 of office and 16,000t2 warehouse unit.

Sheffield Assay Office

33,000 ft2 – JCT 2005 design and build contact – duration 24 weeks – contract value £2.2 million. One of only four Assay offices in the UK. Project includes a testing/hallmarking area, laboratory area, offices and conference facilities.

Company Shop Barnsley

Construction of both phase 1 and phase 2 totalling 100,000 ft2 food store consisting of retail shop unit, cold store, ambient store, offices and associated external works.

Big Yellow Self Storage Stockport

Hp Construction have completed their third unit for Big Yellow Self Storage at S:Park Stockport.

B Braun Aseptic Manufacturing Unit Sheffield

HP Construction completed the 10,000ft aseptic manufacturing unit in 2008 at Chapeltown Sheffield.

Marvel Press Sheffield

22,000 ft2 office and printing works for Hydra Park Properties. This is our sixth project for Hydra Park Properties.

MKM Builders Merchants Durham

We have recently been awarded the construction of a 32,000 ft2 unit with storage area, shop area and associated external concrete yard.

Vets for Pets Retail Unit Castleford

A mixed use retail scheme which included One Stop, Vets for Pets and speculative units on willowbridge Lane Whitwood.

MKM Builders Merchants Castleford

A mixed use retail scheme which included One Stop, Vets for Pets and speculative units on willowbridge Lane Whitwood.

DBL Logistics Sheffield

35,000 ft2 Warehouse / distribution unit for DBL Logistics. The development will enable DBL Logistics to significantly expand its warehouse capacity from 1,500 pallets space to around 6,000.

S:Park Stockport

55,000 ft2 of industrial units split into 5 units at S:Park Stockport for Chancerygate.

Chancerygate Units Erdington

16 no. industrial units at Erdington, Birmingham totaling 38,000 ft 2. Duration: 32 weeks.

Bauer Equipment UK Rotherham

Testing facility for Bauer Equipment UK. Duration: 20 weeks.

Hydra Works Sheffield

Industrial unit for RW Simpson Transport – duration: 24 weeks – contact sum £1.8 million.

Dorehouse Industrial Estate Sheffield

10,000 ft2 industrial unit – duration: 18 weeks – client: Ackroyd and Abbott Developments.

MKM Builders Merchants SHeffield

Conversion of former Ebuyer building to an MKM Builders Merchants including office and concrete yard.

Gordon Rhodes Bradford

Extension to food manufacturing facility – Duration: 12 weeks.

MKM Builders Merchants York

Conversion of a former manufacturing facility into an MKM builders merchants including new concrete external area.

Churchill Way Sheffield

35,000 ft2 overall industrial/ office units comprising two terraced multi units and one bespoke new headquarters building for Neways Building and Maintenance Contractors.

Retail and Storage Unit Mansfield

12,500 square foot unit which includes retail area / storage and concrete external yards at Sherwood Oaks Retail Park Mansfield for Regal Property Group.

Dairy Unit Normanton

HP have recently completed their phase of the works on the 40,000 ft2 new dairy production unit at Premier Way North, Normanton for Fresh Pastures.

Stokes Tiles Sheffield

Contract to construct approx 65000 square foot extension to the existing premises at Halfway Sheffield.

Abaco Systems Towcester

Design and construction of a 29,751sq ft two storey warehouse extension which includes a 19,870 sq ft GF production facility and 9,881 sq ft 1st floor office, together with external works including parking and circulation areas.