Commercial projects

Sheffield Scout Group

Works are now complete at the HQ building for the 105th High Green (Sheffield) Scout group.

AF Switchgear, Sutton in Ashfield

Works are now complete on the new office and production area.

Phoenix Riverside, Rotherham

Works are now complete on the construction of two 5,500 square foot starter units for the Coalfield Regeneration Trust.

Big Yellow Self Storage Sheffield

22,700 ft2 self store unit – duration 26 weeks – contract value 1.8 million

Thurmaston Industrial Estate Leicester

Contract for construction of four units totalling 155,000 sq ft with tenants to include Wickes, Travis Perkins, Benchmarx, BSS and Leicester Tissue Company.

Archer Road Sheffield

33,000 square foot unit over three floors for Litton Properties. The mixed use scheme will have tenants including Costa Coffee, Subway, Pure Gym and Kaspas.

Wickes Wisbech

We have recently completed the new Wickes home improvement centre at Wisbech.

Wickes Sutton

Wickes Trade unit and three further trade units totalling 33,000ft2.

CMS Repcor

HP have now completed the head office and industrial warehouse unit for CMS Cepcor at Coalville Leicestershire. The scheme totalled 27,000ft2 unit comprising of 11,000ft2 of office and 16,000t2 warehouse unit.

Travis Perkins Ruislip

HP Construction have now completed the 15,000 ft2 trade unit at Stonefield Way Ruislip which includes 3,900 ft2 shop fit out package, 3,900ft2 mezzanine and 7,200ft2 warehouse area.

Artis Park Winsford

Contract for the construction of the Artis Park development at Road One Winsford. The project comprises of 13 no units and associated external works.

Big Yellow Self Storage Sheffield

22,700 ft2 self unit – Contract duration 26 weeks – JCT 2005 Design and build contract – contract value £1.8 million.

Sheffield Assay Office

33,000 ft2 – JCT 2005 design and build contact – duration 24 weeks – contract value £2.2 million. One of only four Assay offices in the UK. Project includes a testing/hallmarking area, laboratory area, offices and conference facilities.

Scotts Miracle-Gro Doncaster

Fit out of 164,000 ft2 unit for Scotts Miracle Gro – the world’s largest marketer of branded consumer lawn and garden products. Duration: 12 weeks.

Company Shop Barnsley

Construction of both phase 1 and phase 2 totalling 100,000 ft2 food store consisting of retail shop unit, cold store, ambient store, offices and associated external works.

Big Yellow Self Storage Stockport

Hp Construction have completed their third unit for Big Yellow Self Storage at S:Park Stockport.

Tungsten Park, Sheffield.

Works have been completed at Tungsten Park Sheffield. The project was seven units in total.

Artis Park, Winsford

We are delighted to have completed the two phases of works at Artis Park. The project was a total of 13 units and associated external works and was a joint venture between Kier Properties, Maple Grove Developments and Yorvale.

MKM Builders Merchants Macclesfield

S:Park Stockport

55,000 ft2 of industrial units split into 5 units at S:Park Stockport for Chancerygate.

Chancerygate Units Erdington

16 no. industrial units at Erdington, Birmingham totaling 38,000 ft 2. Duration: 32 weeks.

Bauer Equepment UK Rotherham

Testing facility for Bauer Equipment UK. Duration: 20 weeks.

Dorehouse Industrial Estate Sheffield

10,000 ft2 industrial unit – duration: 18 weeks – client: Ackroyd and Abbott Developments.

Joint Replacement Instrumentation Limited

28,000 ft2 fit out contact – sum approx £800k – duration 13 weeks. Joint Replacement Instrumentation is a British manufacturer of orthopaedic implants and instrumentation.

Verder UK Castleford

Conversion of single storey 33,000 ft2 unit into an office and production facility – including 15,000 ft2 office on two floors with first floor mezzanine – duration: 16 weeks

HP New Head Office Premises

HP Construction are delighted to announce that they have now completed their new head office totalling 6,000ft2.

UK HQ For Össur Lts Stockport

HP Construction Limited have recently completed the fitting out of the 10,000 ft2 UK headquarters building of Össur who manufacture and supply award-winning prosthetics, compression therapies, bracing and supports.

Broadfield Court Sheffield

We are delighted to have recently completed the contract to construct a 4 storey office unit for AG Property (UK).

Mansfield Concorde Way

Works have commenced on the the contruction of a 5,500 square foot starter unit for the Coalfield Regeneration Trust.

B Braun Aseptic Manufacturing Unit Sheffield

HP Construction completed the 10,000ft aseptic manufacturing unit in 2008 at Chapeltown Sheffield.

Office Development Sheffield

8,500 ft2 office building – duration: 20 weeks – contract value £800k.

Travis Perkins Milton Keynes

We are delighted to have been awarded the order for the construction of a new Travis Perkins branch and two further buildings at Lyon Road Bletchley.

Travis Perkins Sale

We are delighted to have been awarded the order for the construction of a new Travis Perkins branch at Elm Grove Sale. Works have commenced on site with completion due November 2018.

Gooding Group, Sheffield

Building works have now completed on site at the construction of the new office and industrial unit. The scheme is a total of 62,000 square foot of office and production space.

Churchill Way Sheffield

35,000 ft2 overall industrial/ office units comprising two terraced multi units and one bespoke new headquarters building for Neways Building and Maintenance Contractors.

Retail and Storage Unit Mansfield

12,500 square foot unit which includes retail area / storage and concrete external yards at Sherwood Oaks Retail Park Mansfield for Regal Property Group.

Wickes Units Stowmarket

New Wickes and TP industrial facility comprising a 20,500ft2 Wickes unit and a 10,500ft2 Travis Perkins branch at Gipping Way Stowmarket.

Vector X-Cel Rotherham

We are delighted to have commenced on the construction of a 32,000 square foot industrial unit which will be complete by May 2023.